Water and Sanitation Programme PDF Print E-mail

alt

Project - 3 year- ACP-EU Watsan in Mt Darwin District, Mashonaland Central Province

Funding - ACP-EU (British and Finish Red Cross)

 

Activities/Targeted-

Drilling of bores 70

• Rehabilitation of water points 110

• Construction of latrines 1200

• Training of builders 220

• Community based management (CBM) training 70 committees

• Sand water abstraction 10

• Hygiene promoters training 220

• Pump minders training 400

• Hygiene promotion into the community target 100 000 people

 

Achievements

 

• Drilling of bores 70

• Rehabilitation of water points 150

• Construction of latrines 1135

• Training of builders 220

• Community based management (CBM) training 207committees

• Sand water abstraction 7

• Hygiene promoters training 254

• Pump minders training 60

111 576 people received hygiene education through PHAST methodology

 

Comments

The project was extended for 4 more months. It will be ending on 31 February 2009

 

Sand abstraction is a new technology which draws water from the river bed. The technology is ideal for livelihood gardens

More water points need rehabilitation. 50 more water points are going to be rehabilitated during the extension period since the budget line has not been exhausted. If money remains by end of project, back spares will be purchased for the local council to operate a spares bank

We decided to reduce on the number of pump minders to be trained. It was learnt that newly trained pump minder without experience were dropping pipes during pump repair

 

 

Project - 6 Months - Appeal Food Security and Livelihood (WatSan) in Beitbridge - Matabeleland South, DeteMatabeleland North and ChiviMasvingo.

 

Funding – IFRCS

Activities/Targeted-

• Rehabilitation/repair of 200 water points

• Fitting and construction of 100 animal water drinking troughs

• ToT training of 16 volunteers and 4 provincial field officers on PHAST

• Community based management refresher training of 200 committees

Cascading of hygiene promotion to safe water beneficiary communities totaling 20 000

 

Achievements

• 200 water points Rehabilitated/repaired

• 100 animal water drinking troughs Fitting

• 16 volunteers and 4 provincial field officers trained as ToTs on PHAST

• 200 CBM teams refreshed

20 000 safe water beneficiaries receive hygiene promotion training

 

Comments

All activities were carried out by end of September 2009

Same of the rehabilitated water points need apron and waste water run away channel repair ( provinces did not consider requesting cement for the construction of apron and waste water run away channel) this was due to lack of knowledge among the field officers. There is need to train field officers on WatSan issues

It has been learnt that there are materials left over at the IFRC ware house. If a budget can be made available these materials can be used for perfection of the rehabilitated water points.

 

 

Project - 6 Months - ECHO Mwenezi Food Security (WatSan)

Funding - ECHO

 

Activities/Targeted-

• Construction of elephant pumps 20

Construction of 20 animal water drinking troughs

 

Position

• 20 elephant pumps constructed

20 animal drinking troughs constructed

 

Comments

Project completed

 

 

Project - Danida Food Security and Livelihood Watsan in Mat. South (Beitbridge), Mat North (Nkayi), Masvingo (Mwenezi)

Funding - Danish Red Cross

 

Activities/Targeted-

• To repair/rehabilitate 135 water points

• To construct 135 animal drinking troughs

• To carry out CBM refresher training for 135 water point committees

Construction of sand water abstraction pumps and gardens 30

 

Position

 

• Implementation work plans, budgets and cash requests were made at provincial leve

• Spares assessments are under way

 

Procurement is in progress

 

Comments

The project is running up to June 2010 as for Masvingo and Mat. North. Mat south will run up to December 2009

 

 

Project - Chitungwiza water works rehabilitation and software

Funding - French Red Cross

 

Activities/Targeted-

• Repair of Prince Edward water works

Hygiene promotion in Chitungwiza’s unit D and NFI distribution

 

Position

 

People reached by hygiene education

Male adults - 5 396

Female adults - 6 089

Male child - 4 851

Female child - 4 961

Total - 21297

 

Distribution of non food Items NFIs

buckets,IEC,soap, water makers, aqua tablets

The repair of the water works was done through French Red Cross Engineer

 

Comments

The project is now complete. This was Medium team watsan intervention after the cholera outbreak Detailed report on work done at the water works still to come from the French Red Cross Engineer

 

 

Project - Kadoma and Chegutu water works rehabilitation and Software

 

Funding - French Red Cross

 

Activities/Targeted-

• To carry out water works rehabilitation at Kadoma and Chegutu

To carry out hygiene promotion in Chegutu and Kadoma

 

Position

Proposal ( logical frame work, budget and implementation plan) prepared awaits ECHO and UNICF approval ( Funders of French RC)

Comments The project will be implemented in the same way as the Chitungwiza above Hardware FRC soft ware ZRCS

 

 

Proposed Project - Germany Proposal

 

Funding - German Red Cross Proposal

 

Activities/Targeted-

Rehabilitation and trainings

Position

Concept submitted to German Red Cross for possible funding to the tune of 800 000Euro ear marked

Comments

Pending

 

 

Proposed Project - ACP-EU Proposal

Funding - German/ACP-EU Proposal

Activities/Targeted-

As per Mt Darwin ACP-EU Watsan project

 

Position

Log frame submitted as per request

Comments

 

Pending - Target areas: Mbire and Mberengwa

 